CoolTherm SC-1200 Thermally Conductive Silicone Gap Filler
Like many highly abrasive silicone gap fillers, the two-component thermal dispense material by Parker LORD® often wears out battery or electronics assembly line equipment. Life testing at the Graco Application Lab identified a durable solution.
Two Component Thermal Dispense
Graco’s complete and durable dispensing solution for CoolTherm® SC-1200 thermally conductive silicone gap filler includes the Electric Fixed Ratio (EFR) system with parts reinforced by Elite construction.
Highly Abrasive Silicone Gap Filler
When applied correctly, CoolTherm® SC 1200 thermally conductive silicone gap filler dissipates heat away from battery and electronic components.
Since the two-component thermal interface material (TIM) is highly filled, it can quickly wear out the equipment that mixes and dispenses it. This is a concern, especially on factory assembly lines with continuous production.
- For complete material profile data on CoolTherm SC-1200, visit ph.parker.com
Life Tests Identify Thermal Dispense Solution
In response to customer concerns, Parker LORD® asked the Graco Application Lab to answer this question:
What Electric Fixed Ratio (EFR) configuration accurately pumps and meters one million dispense shots of CoolTherm SC-1200 without failure?
Over 10 months, Graco engineers ran a life test in three stages, dispensing more than 1.2 million, 75 cc shots of CoolTherm SC 1200 for nearly 460,000 EFR cycles. Each stage was based on equipment configuration.
The stage three life test setup proved to be the two component thermal dispense solution they were looking for. The configuration included:
- An EFR system with two Z-pumps reinforced by Elite construction
- An MD2 valve with Elite construction
- Check-Mate supply pumps with Elite lowers
What is ELITE CONSTRUCTION™?
ELITE™ is a proprietary way to build Graco dispense pumps and valves so that they withstand highly abrasive material like CoolTherm SC 1200 thermally conductive silicone gap filler.
Stage Three Life Testing Results
Stage three comprised the longest life test segment, running continuously for nearly five months. The equipment with Elite construction kept pumping, metering, and dispensing accurately without wearing out.
The test ended when the shot count on the Elite MD2 valve hit one million shots of CoolTherm SC 1200.
PUMP / COMPONENT | SHOT COUNT | LITERS DISPENSED | GALLONS DISPENSED | PUMP CYCLES |
A Elite Z-Pump (100 cc) | 1,224,137 | 45,905.1 | 12,128.2 | 459,051.4 |
B Elite Z-Pump (100 cc) | 1,224,137 | 45,905.1 | 12,128.2 | 459,051.4 |
Total EFR | 1,224,137 | 91,810.3 | 24,256.4 | 459,051.4 |
A Elite Check-Mate (200 cc) | 1,097,866 | 41,170.0 | 10,877.1 | 205,849.9 |
B Elite Check-Mate (200 cc) | 1,097,866 | 41,170.0 | 10,877.1 | 205,849.9 |
Elite MD2 Dispense Valve | 1,011,316 | 37,924.3 | 10,019.6 | 379,243.5 (EFR Cycles) |
All trademarks and registered trademarks are the property of their respective owners.
Download Application Test Report
The CoolTherm SC 1200 Graco Application Lab report includes full details about the scope of work, setups and data from equipment life testing with CoolTherm SC 1200 thermally conductive silicone gap filler.
Recommended Products
For applying CoolTherm SC-1200
Related Applications & Materials
Related Articles
Extreme material abrasiveness? Problem solved with Elite
Some thermal interface materials (TIMs) are so abrasive, it is like pumping diamond dust or liquid sandpaper. Explore why and how we developed Elite, the longest-lasting pump construction for abrasive material dispense.
Electric vehicle thermal management
Whether it’s assembling electric vehicle (EV) batteries, and electronic products, or miniaturizing printed circuit boards (PCBs), thermal management remains crucial to longevity, efficiency and safety.
Controlling Excess Heat
Proper heat dissipation keeps electronics components running optimally